The biggest challenge in energy isn't just generating power, but moving it efficiently. While transmission lines move power geographically, batteries "move" it temporally—from times of surplus to times of scarcity. This reframes batteries as a direct competitor to traditional grid infrastructure.

Related Insights

While solar panels are inexpensive, the total system cost to achieve 100% reliable, 24/7 coverage is massive. These "hidden costs"—enormous battery storage, transmission build-outs, and grid complexity—make the final price of a full solution comparable to nuclear. This is why hyperscalers are actively pursuing nuclear for their data centers.

The primary bottleneck for new energy projects, especially for AI data centers, is the multi-year wait in interconnection queues. Base's strategy circumvents this by deploying batteries where grid infrastructure already exists, enabling them to bring megawatts online in months, not years.

Base's core thesis is that the shift to solar and battery storage is inevitable not because of ESG trends, but because it represents the lowest marginal cost to add power to the grid. This economic argument is more fundamental and compelling than climate narratives alone.

The U.S. has plenty of power for the AI boom, but it's in the wrong places—far from existing data centers, fiber networks, and population centers. The critical challenge is not generation capacity but rather bridging the geographical gap between where power is abundant and where it is needed.

Contrary to the common focus on chip manufacturing, the immediate bottleneck for building new AI data centers is energy. Factors like power availability, grid interconnects, and high-voltage equipment are the true constraints, forcing companies to explore solutions like on-site power generation.

By designing, manufacturing, installing, and operating its own batteries, Base Power creates a flywheel. Greater scale lowers costs, which allows for lower consumer prices, which in turn drives more scale and demand. This strategy is key in a commodity industry.

The cost of electricity has two components: making it and moving it. Generation ("making") costs are plummeting due to cheap solar. However, transmission ("moving") costs are rising from aging infrastructure. This indicates the biggest area for innovation is in distribution, not generation.

The public power grid cannot support the massive energy needs of AI data centers. This will force a shift toward on-site, "behind-the-meter" power generation, likely using natural gas, where data centers generate their own power and only "sip" from the grid during off-peak times.

Pricing electricity at thousands of physical grid locations ("nodes") is not an arbitrary complexity. The price differentials between nodes create precise financial signals that show developers the most valuable locations to build new power plants or transmission lines, helping to alleviate system congestion and improve efficiency.

Crusoe's CEO explains their core strategy isn't just finding stranded energy, but actively developing new power sources alongside their AI factories. By building out power capacity to meet peak demand, they create an abundance of energy that can also benefit the surrounding grid, turning a potential liability into an asset.